nyc dot traffic standard drawings

THIS SEGMENT IS PARTIALLY DESIGNATED LANDMARK. THE TRAFFIC STIPULATIONS ON THIS PERMIT DO NOT GO INTO EFFECT AS LONG AS THE CONTRACTOR CONTINUES TO WORK NON-STOP, AROUND THE CLOCK, TO CORRECT THE EMERGENCY SITUATION. A separate permit is required for each construction-related activity, except where otherwise provided in the Highway Rules or by permit stipulations. New York 811 then relays digging and excavation requests to its member network of utility companies and underground facility owners, who are required to mark the location of their underground facilities within two working days. SECTION 6: LEGAL ENTITY PERSONNEL: OFFICERS/ DIRECTORS/ MANAGING AGENTS/ OWNER/ PARTNERS /MEMBERS /INDIVIDUALS, ETC. Applicants must first submit an Emergency Street Opening Permit Form. WITHIN THIS TIME FRAME ONE WAY ROADWAYS LESS THAN 39FT. Connecticut Department of Transportation Division of Traffic Engineering Email: DOT.TrafficElectrical@ct.gov. For failure to comply with the terms or conditions of such permit, the Highway Rules or other applicable law in carrying out the activity for which the permit was issued; Whenever there has been any false statement or any misrepresentation as to a material fact in the application or accompanying papers upon which the issuance of the permit was based; or. If all information is satisfactory the applicant is approved and the system auto-generates an email which is sent to the applicant with the EAN. An online permit processing application significantly enhanced the efficiency of NYC DOT permitting operations. DOTs lighting-levels and uniformity guidelines are based on those established by the IES Roadway Lighting standard RP-8-14 (or more stringent where needed). Bronx.Forestry@parks.nyc.gov THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR CURB TO CURB RESTORATION AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. They shall not be in a stand alone subset. APPROVED PLANS MUST BE ON SITE. Permits that have expired may be reissued only within30 daysof expiration. Tel: 718-556-7240 (212) 839-2387/88/89 Some of the requirements include, but are not limited to the following, where the applicant must: New York 811 is a nonprofit organization that acts as a communications link between utility companies and individuals planning any digging activity in the five boroughs of New York City and Nassau and Suffolk Counties on Long Island. PRIOR TO BEGINING ANY WORK, TO ENSURE THAT YOU RESTORE THE AREA IN-KIND,YOU MUST CONTACT THE NYC TRAFFIC PLANNING DIVISION TO OBTAIN THE CONSTRUCTION AND MARKING PLANS FOR SPEED REDUCER INSTALLATION AND ANY SIGNAGE ASSOCIATED WITH THE REDUCER. Manhattan check-in window hours extended to 3:30pm for Bronx work only. 4. New York, NY 10007 WHEN POSTING SIGNS ON TREES ONLY ELASTIC BANDS MAY BE USED. These are in addition to the "Common Requirements" listed at the beginning of this section. DURING CLOSURE SCA MUST SUPERVISE FLAGERS AT EACH INTERSECTION APPROCHING THE WALKWAY CLOSURE DIRECTING PEDESTRIAN TO OPPOSITE SIDEWALK VIA CROSSWALK. If the applicant makes any changes to these authorized representative(s), he or she must update the Permittee Registration Application. Outlined below are the basic application procedures for Street Opening Permits. NYC DOT's HIQA unit inspects work sites for compliance with Title 19 of the NYC Administrative Code, NYC DOT Rules and Regulations, NYC DOT specifications and NYC DOT permit stipulations. Keywords: Portable, Sign, Support, Temporary, Wooden, Keywords: Portable, Temporary, Rumble Strips, Keywords: Closure, Encroachment, Lane, Mowing,Shoulder, Special, 1FTRES-RESTORE AS PER SKETCH #9 OD DOT'S PROTECTED STREET RESTORATION REQ'MENTS. 66 John Street, 10th Floor Division of Traffic Engineering One tool highlighted in this chapter is DOTMap, a data sharing initiative that allows for better coordination of planned street reconstruction and resurfacing activities with other street excavation work. Permittees are responsible for maintaining the restoration for the duration of the "Guarantee Period" and must retain insurance for this purpose. Details about the exact holiday embargo dates, times, and locations are posted on NYC DOT's Special Traffic Advisory page, generally in mid-October. Some of the activities covered include placement of materials, equipment and temporary structures on the street or movement of construction equipment across roadways and sidewalks. PERMITTEE IS REQUIRED TO CALL NYCDOT HIQA OFFICE AT 212-839-2430 TO SCHEDULE THEIR RE-DIG. Brooklyn, NY 11202 Additionally, in the middle of each fiscal year, the New York City Department of Design and Construction (DDC) convenes a meeting with other agencies and utilities to discuss city projects under its purview that are expected to begin construction during the next four years. CNRRES-RESTORE AS PER SKETCH #6 OF DOT'S PROTECTED STREET RESTORAITON REQ'MENTS. 10 Richmond Terrace, Room 308 3030 Third Avenue ALL WORK OPERATIONS MUST BE RESTRICTED WITHIN 11 FEET OF THE SOUTHEAST QUADRANT OF THE INTERSECTION. FULL CORNER QUADRANT RESTORATION IS REQUIRED FOR ALL CORNER QUADRANTS EXCAVATED. The location to which the application should be submitted depends on the location and type of construction-related work to be performed: Central Permit Office in ManhattanIn-person applications for non-emergency work, including work on all streets in Manhattan and on all critical streets in Brooklyn, Queens and the Bronx; all work to be performed for sewer and water system construction; and all capital project work, all utility work, all crane requests, and all full closures of sidewalks and roadways must be submitted only to the central Permit Office in Manhattan. These are in addition to the "Common Requirements" listed at the beginning of this section. However the permit window remains open until 3:15 PM to pick up permits. Copy of E.I.N. If guide sheets are to be included in a project, they should be included in a subset under that project. Information on restoration requirements following street openings/excavations can be found inChapter 4 Executing Work in the Street. LOCAL AND EMERGENCY ACCESS MUST BE PROVIDED FROM EACH END OF THE BLOCK AT THE INTERSECTIONS WITH USE OF FLAGGERS AND SIGNAGE. Applicants who are registered as permitees (see Section 3.2) and are registered for on-line permitting can log-in to NYCStreets and submit a request for an emergency street opening/excavation permit. The city has master revocable consent agreements with electric utility companies that allow them to occupy and use city property for transformer vaults. All addresses must be the same on all above referenced documents. MAINTAIN ONE 11 FOOT LANE FOR THRU TRAFFIC 9 AM TO 2 PM AND 3:30 PM TO 6 PM MON. AS COORDINATED WITH COMMUNITY BOARD, CON ED. If the hold is not released, the applicant must contact the borough ASHO to determine the feasibility of the work being completed prior to the final resurfacing. Office hours: 8:30 AM-5:00 PM, Manhattan After repairs are complete, the property owner can contact 311 to schedule a Sidewalk Violation Dismissal. ALL WORK TO MEET OR EXCEED NYC DOT STANDARDS. Coordinating street work in accordance with the principles of this section will help to minimize delays and disruption to road users, businesses and residents and help extend the useful life of city streets. The Bronx THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR EXTENDED TRENCH MORE THAN REGULAR CUT-BACK AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. Abuilding vault, as described in Section 2-13 of the Highway Rules, is any opening below the surface of the street that projects outside of the property line and is covered over, except for those openings: (1) used exclusively to access, by means of steps, the cellar or basement of any building; (2) used primarily for light and ventilation; (3) constructed or maintained by utility companies (including transformer vaults); and (4) which are subways, railroads and related structures. The suspension does not apply to emergency authorizations and permits (see Section 3.6.1 Emergency Utility Access Cover Openings and Emergency Street Openings). DOT Street Lighting's, Permeable Interlocking Concrete Paver (PICP), Illuminating Engineering Society of North America. To request release of the hold, the permittee must take out a permit of record for the work that was performed without a permit and then contact HIQA to submit a copy of the permit. 59 Maiden Lane, 34th Floor (See Chapter 4, Section 4.5 Street Construction Inspections and Enforcement regarding the circumstances in which CARs may be issued.). The applicant may be required to address the circumstances of a hold before a permit is released. 16 Court Street, 15th floor NYCityMap is the city's web-based interactive mapping application. NO NOISY OPERATIONS BETWEEN 12:01 AM AND 7:00AM. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. The applicant submits a completed Canopy Authorization Application, which must include the following: Written approval from the owner of the property to which the canopy will be attached. This information should be used to plan work before streets go into protected street status. Street excavations also adversely affect the condition of the streets, reducing the number of years the pavement would otherwise be expected to remain in good or excellent condition following resurfacing or reconstruction, and increasing repair and life cycle costs for the city. IF MORE THAN 50% OF THE SIDEWALK FRONTAGE IS AFFECTED THE ENTIRE SIDEWALK MUST BE REPLACED WITH THE NEW 4.13C STANDARD. (212) 442-7962 Drawings are available in various formats including PDF (Acrobat), DGN (MicroStation Design File), DWG and DXF (AutoCAD Drawing), and other image types (TIF, DPR). Customer Service: (718) 802-3675, Manhattan NYC DOT may order a vault licensee or the owner of the premises where the vault is located to fill in an abandoned vault. DURING WORKING HOURS SIDEWALK MAY BE CLOSED PROVIDED FLAGGERS ARE AT EACH INTERSECTION AND AT BOTH ENDS OF WORK SITE TO SAFELY CROSS PEDESTRIANS. Sidewalk GradesUnless granted a waiver from NYC DOT, permanent sidewalks must be laid to the legal curb grades. VARIANCE GRANTED TO WORK DURING SCHOOL HOURS AS STIPULATED BY O.C.M.C. Click here to access theHighway Rules. New York, NY 10013 A one-time Street Opening Permit must also be obtained to install the poles that support the canopy. Tel: (718) 430-1877, Brooklyn Section 2.3 Key Principles for Effective Notice and Coordination of Planned Street Work, Section 3.3 The Permit Application Process, Section 3.6 Emergency Work and Special Circumstances, http://www.nyc.gov/html/dot/downloads/pdf/insurancereq.pdf, Instructions for Permittee Registration Application, Application for Roadway/Sidewalk Permit(s), Appendix A, Common Permit Types and Documents Needed, Appendix D, Other Agency and Utility Contact Information, Application for Governmental Work Permit(s), Section 3.5 Other Provisions Pertaining to Permits, Application to Renew Governmental Permit(s), The permit application is available online, Chapter 4, Section 4.5 Street Construction Inspections and Enforcement, Request for Roadway/Sidewalk Permits during Embargo Periods form, Section 4.3 Street Restoration Requirements, Building Operations/Construction Activity Permits, Minimum Clearance Requirements For Transformer Vaults, Department of Design and Construction, Construction Director Borough Offices, Department of City Planning Borough Offices, Department of Parks and Recreation Borough Offices, Environmental Control Board Borough Offices, Chapter 2Advance Notice and Coordination of Planned Street Work, Instructions for Filing Plans and Guidelines for the Design of Sidewalks, Curbs, Roadways and Other Infrastructure Components, Street Arterial Maintenance (SAM) Release Form for Protected Streets, Application to Renew Governmental Work Permit(s), Application to Reissue Governmental Work Permit(s), Written Consent from Property Owner to install and maintain a canopy, Temporary Construction Signage Purchase Directions, Construction Project Information Signs (CPIS) Directions, Engineering Package for Vault Application, Section 3.4 Canopy Authorization and Permits, Weekly milling, resurfacing and concrete repair schedules, Insurance and Indemnification Requirements from Title 34, Rules of the City of New York, Critical Streets list in the Highway Rules, Section 2-07 (c) (5), Franchise, Concession or Revocable Consent, Application to Re-issue Government Permits, Additional information about historic districts, Construction Embargos at the Special Traffic Advisory link, Request for Roadway/Sidewalk Permits during Embargo Periods, Information regarding sidewalk violations, Pave Street-W/ Engineering & Inspection Fee, Place Equipment Other Than Crane Or Shovel, Franchise Installations (Overhead Structures), Electric power lines, cables, conduit and lighting cables, Gas, oil, steam, petroleum and gaseous materials, Communications, alarm, signal lines, cables and conduit, Reclaimed water, irrigation and slurry lines, REQUIRES DOB APPROVAL or REQUIRES DOT FRANCHISE, CONDUIT CONSTRUCTION (CABLE, TELECOMMUNICATION) AND FRANCHISE, REQUIRES DOT HIGHWAY INSPECTION QUALITY ASSURANCE (HIQA) APPROVAL, REQUIRES APPROVAL FROM DOT SIGNALS UNIT or, REQUIRES DOB APPROVAL (IF IN CONJUNCTION WITH A NEW BUILDING OR BUILDING ALTERATION), FRANCHISE INSTALLATION (OVERHEAD STRUCTURE), REQUIRES APPROVAL FROM DOT STREET LIGHTING UNIT, Franchises, Concessions and Consents - (212) 839-6550, MTA/NYCT - Bus Operations - (646) 252-5517 or (646) 252-5544, 18 inches (maximum 24 inches) from the grating edge perpendicular to curb, Division of Review & Construction Compliance - (718) 595-5223 or Plan Review Section - (718) 595-5191, * Maintain minimum Clear Path requirement (Below), General customer service - (800) ASK-USPS, 5 feet offset along the curb line (Not Permitted in front), Department of Consumer Affairs - 311 or (212) NEW-YORK outside the five boroughs, Con Ed, Verizon, National Grid, etc. These include: Certain circumstances are considered to be emergencies, meaning situations that endanger the public safety or cause or are likely to cause the imminent interruption of service. Tel: (718) 875-7428 View the most recent version of Drawing #H1029 of the NYC DOT. The completed Permittee Registration Application and other required documents must be submitted in person to the NYC DOT central Permit Office to complete the registration process. A SEPARATE 221 PERMIT IS NOT REQUIRED FOR CAPITAL/GOVT PROJECTS. THREE SPEED REDUCERS ARE LOCATED IN THE ROADWAY OF YOUR PROPOSED WORK AREA.PRIOR TO BEGINING ANY WORK, TO ENSURE THAT YOU RESTORE IN-KIND, YOU MUST CONTACT THE NYC TRAFFIC PLANNING DIVISION TO OBTAIN THE CONSTRUCTION AND MARKING PLANS FOR SPEED REDUCER INSTALLATION AND ANY SIGNAGE ASSOCIATED WITH THE REDUCER. New York State Department of Transportation coordinates operation of transportation facilities and services including highway, bridges, railroad, mass transit, port, waterway and aviation facilities . NO WORK SHALL BE PERFORMED UNDER THIS PERMIT UNLESS ACCOMPANIED BY AN ACTIVE VAULT PERMIT AT THE SAME LOCATION (EITHER PERMIT TYPE 117,107 OR 106). IF MULTIPLE LANES ON GOWANUS IN SAME DIRECTION AS MILLING, NO MILLINGY WORK MAY OCCUR. NO EQUIPMENT/MAT'L MAY BE PLACED ON TOP OF SENSORS. Listed in the table are the most commonly requested Building Operations/Construction Activity Permit types, which may be used when completing an application. Brooklyn New York, NY 10038 The permittee may apply for a re-issuance online, or in-person by accessing either theApplication to Re-Issue Permitsor theApplication to Re-Issue Governmental Work Permit(s). USE OF NO STOPPING ZONES, NO STANDING ZONES AUTHORIZED PARKING, DIPLOMAT PARKING AND TAXI ZONES IS PROHIBITED. The form must be completed and faxed to EAU, which will confirm that the applicant's insurance is current. Fax: (718) 430-4663 Office hours: 8:30 AM-5:00 PM, Queens CONTRACTORS SHALL NOTIFY POLICE, FIRE, EMS, COMMUNITY BOARDS, AND ABUTTING PROPERTY OWNERS 48 HOURS PRIOR TO CONSTRUCTION. At the HIQA borough office, applicants will be given a Canopy Authorization Application (. The Bridge Hold Map shows locations where Bridge holds apply. 3. WORK 7PM TO 11PM MON. New York, NY 10007 280 Broadway, 3rd Floor Restoration Once work in the street has been completed, permittees are required to restore the street excavation to provide a smooth riding surface. Brooklyn RESTORE ALL TRAVEL LANES WHEN SITE IS UNATTENDED CONTRACTOR MAY CONTAIN A MAXIMUM OF 25 LINEAR FEET, 8 FEET ADJACENT TO THE CURB DURING NON-WORK HOURS. This is discussed in greater detail under Section 4.3 Street Restoration Requirements, and in theSections 2-11(e)(15), 2-11(e)(16) and 2-11(f) of the Highway Rules. Capital Project In-House (CPI) hold A CPI hold is automatically placed if the proposed permit location involves a street that will be resurfaced by a NYC DOT in-house resurfacing operation in the near future. To request release of the hold, the permittee must contact HIQAs central office or one of the borough offices to update the file. Workers pour cement during sidewalk reconstruction. There is no fine associated with a Sidewalk Violation. NYC DOT's concrete repair schedule for roadways, sidewalks and other assets in the street can also be accessed from this link. The applicant will be charged a fee of $30 for each utility access cover opening EAN. "Base course" refers to the layer of material below the wearing course. To request release of a COB hold, the applicant must contact the HIQA borough office in the borough in which the proposed work is to be performed to arrange for an inspector to visit the work site prior to the start of the work. Worker's Compensation Insurance. The purpose of placing a street in protected status is to maintain the integrity of a new street surface. For non-DDC capital projects, the applicant may contact the Permit Office to request release of a CPO hold. SIGNS MUST BE POSTED AT WORK ZONES AS WELL AS BOTH INTERSECTIONS OF AFFECTED SIDEWALK. NYCStreets system will automatically block an applicant from submission if insurance is not current. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL EQUIPMENT, VEHICLES AND PERSONNEL ON OR AROUND WORK SITE. Asingle PDF of the 619 Standard Sheets is available attheOfficial Electronic Standard Specifications and Standard Sheets website. MUST COORDINATE WITH NYPD PRECINCT C.O. Click here for a completed. The form must be completed and faxed to NYC DOTs Emergency Authorization Unit (EAU), which will confirm that the applicant's insurance is current and that the location requires an EAN. PHONE # (508) 429-6023. Brooklyn, NY 11241-0103 Need a permit for a street-related project in NYC? Once OCMC executive staff determines the final permit stipulations, the permit will be released. OFFICE. Click here to view a sample certification formand in Appendix B, Forms. Telephone inquiries: 8:30 AM-4:30 PM, Staten Island Applicants who prefer to apply in person may do so using an Application for Roadway/Sidewalk Permit(s)or seeAppendix B, Forms. Emergency work will not be placed on hold and shall proceed in accordance with Highway Rules, Section 2-11 (g). Building Operations/Construction Activity Permits are generally taken out by entities that perform construction activities, including developers and contractors. 144-06 94th Avenue, Main Floor NOTARIZE THE FORM. Designers and contractors should refer to the specifications listed below with special attention to the Construction & Material Specifications; Highway Lighting, Traffic Control, and Intelligent Transportation . Other conditions may apply, such as a variation in the distance and width of the job, which may increase the fee required. DURING NON-WORKING HOURS PEDESTRIAN WALK WAY MUST BE MAINTAINED ON SIDEWALK OR ON ROADWAY. If the applicant intends to do work associated with a Franchise, Concession or Revocable Consent Agreement, the applicant must have a copy of the Agreement prior to applying for a permit. 24 West 61st St., 5th Fl. POSTING OF SIGNS ON MTA/NYCT ANTENNA POLES IS PROHIBITED. Tel: (646) 252-5517 or (646) 252-5544, New York State Department of Transportation (NYSDOT) PLACE LEFT LIGHTED ARROW BOARD 24/7 NE CORNER OF AMSTERDAM AVE/W.60 ST. NO IMPACT ON 4 TRAVEL LANES AT ANY TIME. WORK 12:01 AM - 5 AM, MONDAY TO FRIDAY AND/OR SUNDAY 12:01 AM TO 8 AM, FULL CLOSURE OF ROADWAY, RESTORE FULL WIDTH WHEN SITE IS UNATTENDED. See, Sidewalks must conform to ADA requirements for a minimum clear-path width and provision of spaces where wheelchair users can pass one another or turn around, Provide an unobstructed clear path of 8 feet or one half the sidewalk width (whichever is greater) in commercial, high-density residential, and transit-adjacent areas, Sidewalks in low-rise residential areas should be at least 5 feet wide, Wherever possible, sidewalk cross-slope should not be greater than 2%, Sidewalks must meet load-bearing, friction, and other requirements per relevant standard specifications and regulations, Color of detectable warning strips on pedestrian ramps should contrast with surrounding pavement: red for, The area within 18 inches of the curb should be kept free of all obstructions, New York City Mayors Executive Order No.22 of 1995 (the Clear Corner Policy) states that to the maximum extent possible, structures and objects should not be placed in the corner quadrant, For recommended clearances between obstructions, see, Include planted areas and stormwater source controls within sidewalks wherever possible when a maintenance partner is identified, If work includes tree planting, consider the location of utility infrastructure, including DEP sewers and water mains, Maximize trees and other green cover wherever clearance allows. By mutually sharing data before detailed construction plans have been developed NYC DOT and street excavators can adjust their project plans to avoid conflict and maximize the potential opportunity for street work coordination. The applicant must obtain CGL insurance policies written by companies that may lawfully issue such policies, with an A.M. Best rating of at least A-VII or a Standard & Poor's rating of at least AA. An explanation and description of "Holds" may be found in Section 3.5 Other Provisions Pertaining to Permits of this chapter. APPLICANT INFORMATION (SOLE PROPRIETORSHIP). THIS PERMIT IS BEING ISSUED WITH UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR BLOCK SEGMENT CURB TO CURB RESTORATION AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. Suspension of Application Review NYC DOT may suspend the review of applications for permits pending: Refusal to Issue Permit NYC DOT may refuse to issue a permit to an applicant: Voiding and Reissuing of Permits. The Permit Bureau issues a number of different categories of construction-related permits for work on a street. Homeowners applying for Sidewalk Construction permits who intend to do the work themselves do not need to register. If there is no hold, the permit is issued to the applicant after appropriate payment is received. By accessing this map portal, a utility company or any other entity that performs street excavation work can find details on NYC DOT projects included in the city's 10-year Capital Budget, as well as more imminent NYC DOT and New York City Department of Environmental Protection capital projects currently in design or under construction. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. Fax: (212) 860-1359 Office hours: 8:30 AM-3:30 PM. 3.1 General Provisions For Construction-Related Permits PHONE#508-429-6023. WORK 7 PM FRIDAY TO 6 AM MONDAY AND 7 PM-6 AM WEEKNIGHTS. This Manual was created and published by the NYC Department of Transportation (NYC DOT) with contributions from a wide array of professionals from city government and the design field. (212) 839-8980 SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. COMPLY WITH DOT STANDARD #H1042C. Whenever a permit has been issued in error and the conditions are such that the permit should not have been issued. At that point, OCMC executive staff will determine if additional permit stipulations are required. This form cannot be used if the permit has already expired. If the applicant does not accept the permit stipulations, he or she can request a review with the PM. New York, NY 10007 4.13 C OF THE DEPT. Office hours: 8:30 AM-4:30 PM, Queens It provides both a thorough update to the guidance in previous iterations and a number of important additions: a new chapter on public programming in streets and public spaces; a host of new entries throughout the Process, Geometry, Furniture, and Landscape chapters; and substantially expanded coverage of several key topics, including bike lanes, inclusive design, and landscape selection and management. Kew Gardens, NY 11415 Bronx, NY 10462 In addition to the application procedures for the four categories of permit types, there are some situations or street conditions that require special procedures. Markets, public art, performances, and other events support a vital public realm, increasing pedestrian activity;supporting local businesses;connecting residents with resources;celebrating community, culture, and diversity;and encouraging local ownership of the public spaces in which they occur. LOADING AND UNLOADING, STANDING OR PARKING IN A LANE ADJACENT TO THE WORK ZONE IN THE ROADWAY IS PROHIBITED. New York City Department of Consumer Affairs (DCA) Other requirements may apply to the movement of cranes within city limits, such as daily or annual over-dimensional travel permit(s) as issued by NYC DOT. (212) 442-1890 16 Court Street, 16th floor One Fordham Plaza, 5th Fl. A permit is not required to install, repave, reconstruct or repair any sidewalk where the work involves an area of less than 25 square feet, unless the purpose of the work is to remove a violation. The protected streets layer is current as of the previous business day. ALL WORK OPERATIONS MUST BE RESTRICTED WITHIN 11 FEET OF THE NORTHWEST QUADRANT OF THE INTERSECTION.